When should Power Transformers be selected instead of Oil-Immersed Transformers?+
For Kosovo, choose Power Transformers when the main duties are Transmission substations and Sub-transmission substations; compare Oil-Immersed Transformers when Utility distribution networks and Distribution substations better match the site. Final selection depends on the installation environment, network topology, fire or oil-containment requirements, rating and project specification.
How should the main configuration options for Power Transformers be selected?+
Key choices include ONAN/ONAF cooling stages, tap changer / OLTC and monitoring and protection. Select them according to the load profile, connection arrangement, installation environment, protection philosophy and utility/EPC specification; items shown as options or project engineering are not automatic standard equipment.
What installation conditions should be confirmed for Power Transformers projects in Kosovo?+
Confirm ambient temperature, altitude, humidity, dust or corrosion exposure, indoor/outdoor location, ventilation, access and maintenance clearances. For applications such as Transmission substations, Sub-transmission substations and Mining operations, cooling, enclosure or insulation and protection should be reviewed during engineering rather than assuming one environmental class for the whole country.
Which standards and utility/project requirements should be confirmed in Kosovo?+
Use KOSTT Electrical Equipment Code as the starting technical reference. Requirements from KOSTT / KEDS / ERO(ZRRE) should also be confirmed. Final losses, temperature rise, impedance, taps, accessories, tests and documentation must be checked against the applicable project specification; this page does not imply automatic approval by any authority.
What tests, drawings and documents should be agreed before the purchase order?+
Confirm the applicable routine tests, general arrangement drawings, electrical datasheet, accessory list and inspection/test documents before manufacturing. Type or special tests, witnessing and additional reports should be specified when the project requires them. For Power Transformers, also confirm site-specific environmental and installation engineering.
What information does HKXR need to prepare a technical quotation?+
Provide at least Rated capacity, Primary voltage, Secondary voltage, Phases, the selected ONAN/ONAF cooling stages / tap changer / OLTC options, installation conditions and the applicable project or utility specification. If available, attach the SLD, datasheet or tender specification so the configuration can be reviewed before quotation.