When should Oil-Immersed Transformers be selected instead of Dry-Type Transformers?+
For Kosovo, choose Oil-Immersed Transformers when the main duties are Utility distribution networks and Distribution substations; compare Dry-Type Transformers when Indoor substations and Commercial buildings better match the site. Final selection depends on the installation environment, network topology, fire or oil-containment requirements, rating and project specification.
How should the main configuration options for Oil-Immersed Transformers be selected?+
Key choices include tap changer, bushings and terminations and protection and accessories. Select them according to the load profile, connection arrangement, installation environment, protection philosophy and utility/EPC specification; items shown as options or project engineering are not automatic standard equipment.
What installation conditions should be confirmed for Oil-Immersed Transformers projects in Kosovo?+
Confirm ambient temperature, altitude, humidity, dust or corrosion exposure, indoor/outdoor location, ventilation, access and maintenance clearances. For applications such as Utility distribution networks, Distribution substations and Industrial facilities, cooling, enclosure or insulation and protection should be reviewed during engineering rather than assuming one environmental class for the whole country.
Which standards and utility/project requirements should be confirmed in Kosovo?+
Use KOSTT Electrical Equipment Code as the starting technical reference. Requirements from KOSTT / KEDS / ERO(ZRRE) should also be confirmed. Final losses, temperature rise, impedance, taps, accessories, tests and documentation must be checked against the applicable project specification; this page does not imply automatic approval by any authority.
What tests, drawings and documents should be agreed before the purchase order?+
Confirm the applicable routine tests, general arrangement drawings, electrical datasheet, accessory list and inspection/test documents before manufacturing. Type or special tests, witnessing and additional reports should be specified when the project requires them. For Oil-Immersed Transformers, also confirm site-specific environmental and installation engineering.
What information does HKXR need to prepare a technical quotation?+
Provide at least Rated capacity, Primary voltage, Secondary voltage, Phases, the selected tap changer / bushings and terminations options, installation conditions and the applicable project or utility specification. If available, attach the SLD, datasheet or tender specification so the configuration can be reviewed before quotation.