01
Main Switchboards (MSB) & LV Switchgear
Main switchboards (MSB) and LV switchgear for industrial distribution and building electrical rooms. Define incomers, feeders, metering and project verification requirements.
View detailsSwitchgear & Distribution
Main switchboards, distribution boards, MCCs and PLC panels for Australian industrial, building and infrastructure projects. Share your drawings to discuss configuration and supply.

01 / PRODUCT CATEGORIES
Explore the product scope, configuration requirements and documentation for each category.
01
Main switchboards (MSB) and LV switchgear for industrial distribution and building electrical rooms. Define incomers, feeders, metering and project verification requirements.
View details02
Medium-voltage switchgear for industrial and substation projects. Discuss the required voltage class, protection and panel arrangement; identify any RMU requirement separately.
View details03
Distribution boards and sub-distribution boards for building circuits and equipment supplies. Keep branch distribution requirements separate from the main switchboard.
View details04
Motor feeder and starter arrangements organized around the motor list, operating sequence and protection requirements.
View details05
PLC control panels and industrial control cabinets for process equipment, pumps and automation. Define hardware, programming and support as separate scope items.
View details06
Power factor correction panels and APFC arrangements selected around measured load, power factor and harmonic conditions.
View details07
Custom electrical cabinets and switchboard assemblies for OEM and drawing-based projects. Define enclosure, components and assembly requirements for export supply.
View details02 / APPLICATION ENGINEERING
Compare main switchboards, MV switching and sub-distribution around the project single-line diagram.
Power distributionDefine motor duties, starter preferences and the operating environment for plant and pump systems.
Motor controlShare the I/O list, equipment interfaces and control sequence for PLC/HMI scope.
PLC & automation03 / PROJECT CONFIGURATION
Send the single-line diagram, panel schedule, motor list, I/O list, BOM or drawings relevant to the selected product.
Separate enclosure work, components, assembly, software and any commissioning requirements.
Record the electrical schedule, arrangement, wiring and inspection requirements with the quotation.
04 / MANUFACTURING & PROJECTS
05 Decision support
Start with the distribution function, motor loads or automation task. Each category page lists its selection inputs, construction considerations and project documents.
Yes. Share the available single-line diagram, GA drawing, wiring diagram, BOM or control sequence with your inquiry. State which parts of the scope are already defined.
Include the manufacturer and model references, acceptable alternatives and any project restrictions in the component schedule.
Identify enclosure fabrication, components, panel assembly, software, testing and documentation requirements individually.
For an Australian project, provide the installation location, nominated project standards, supply conditions and required verification records. Confirm compliance against the selected assembly and its supporting documents.
Choose a category below and include quantity, destination, schedule and your available project information. Continue through WhatsApp or email and attach the referenced files in that application.
Let’s discuss your project
Select a product category and share your available project information.
Alternative contact