Power transformers for Malawi grid and substation projects, with HKXR standard 110 kV and 220 kV families plus engineering review for Malawi 66 kV, 132 kV and 400 kV system requirements.

Rated capacity110 kV: 6.3–63 MVA / 220 kV: 50–360 MVA
Primary voltage110 / 220 kV
PhasesThree-phase; two- / three-winding
ApplicationsTransmission and subtransmission substations / Grid reinforcement

Rated capacity: 110 kV: 6.3–63 MVA / 220 kV: 50–360 MVA · Primary voltage: 110 / 220 kV · Secondary voltage: 11 / 33 / 66 kV

Power Transformers

01 Technical data

Specifications for initial selection

Rated capacity: 110 kV: 6.3–63 MVA / 220 kV: 50–360 MVA · Primary voltage: 110 / 220 kV · Secondary voltage: 11 / 33 / 66 kV

Rated capacity
110 kV: 6.3 / 8 / 10 / 12.5 / 16 / 20 / 25 / 31.5 / 40 / 50 / 63 MVA; 220 kV: 50 / 63 / 90 / 120 / 150 / 180 / 240 / 300 / 360 MVA
Primary voltage
110 / 220 kV
Secondary voltage
11 / 33 / 66 kV
Phases
Three-phase; two- / three-winding
Winding configuration
Two-winding / three-winding
Tap changing
NLTC / OLTC
Vector group
YNd11 / YNyn0d11
Short-circuit impedance
110 kV: 10.5% · 220 kV: 12–14%

02 Application engineering

Applications

Power transformers for transmission and sub-transmission substations in Malawi (110 / 220 kV), supporting grid reinforcement, generation and large-load connections in projects spanning agriculture and hydropower, where engineered, project-specific design is the norm.

01

Transmission and sub-transmission substations

Main step-down and step-up transformers in high-voltage substations (110 / 220 kV), forming the link between transmission and distribution levels. Design is project-specific, based on the grid study, short-circuit levels, regulation needs and the requirements of ESCOM.

02

Generation and hydropower stations

Generator step-up and station-service transformers for thermal, gas and hydropower plants. Duty includes high short-circuit stress and frequent operation; cooling, protection and monitoring are defined in the plant specification.

03

Grid reinforcement and expansion

Added or replacement capacity in substations where demand growth, new feeders or ageing assets require reinforcement. Power transformers are specified to match existing bay layout, protection scheme, tap-changer control and transport access.

Where to apply

  • Transmission substations
  • Sub-transmission substations
  • Power generation
  • Grid reinforcement
  • Renewable energy interconnection
  • Large infrastructure

03 Define your configuration

Configure your transformer

Select the main project parameters.

Rated capacity

110 kV

220 kV

Primary voltage

Secondary voltage

Phases

Additional options

Vector group

Short-circuit impedance

Winding configuration

Tap changing

04 Construction and options

Technical resources and options

Typical configuration

Oil-immersed core-and-coil active part in a welded steel tank with radiators, mechanically designed for short-circuit withstand and transport limits.

Available option

Winding configuration and cooling: two- or three-winding designs; ONAN radiators as base, with ONAF fan-assisted cooling (and forced oil cooling at higher ratings) specified when extra loading capability is needed.

Available option

Tap changing: off-circuit tap changer or on-load tap changer (OLTC) with motor drive and control panel, chosen by voltage-regulation need; OLTC type and location are confirmed per project.

Available option

Bushings and connections: oil-to-air porcelain or composite bushings, bushing current transformers, and cable-box or GIS interfaces where required, with creepage distance matched to site pollution.

Available option

Protection accessories: Buchholz relay, pressure-relief device, oil and winding temperature indicators, oil-level gauge and a marshalling cabinet with alarm and trip contacts, per MS IEC 60076 and the ESCOM / project technical specification.

Project engineering

Condition monitoring: online dissolved gas analysis (DGA), fiber-optic winding hot-spot measurement, bushing monitoring and SCADA interfaces can be specified by rating and monitoring philosophy; scope is confirmed at project level.

Project engineering

Transport, installation and environment for variable outdoor exposure such as UV, rain, wind and coastal or industrial atmosphere depending on the site: shipping dimensions and mass, on-site assembly, seismic and altitude requirements and special coatings are engineered per project.

05 Applicable standards and requirements

Standards & engineering

MS-IEC 60076 + ESCOM/MBS project requirements
MS-IEC 60076 + ESCOM/MBS project requirements; BIL, OLTC, impedance, losses, cooling, protection, testing. Project and utility requirements apply.
ESCOM / project utility requirements
MS-IEC 60076 + ESCOM/MBS project requirements; BIL, OLTC, impedance, losses, cooling, protection, testing. Project and utility requirements apply.
Primary voltage
110 / 220 kV
Secondary voltage
11 / 33 / 66 kV
Request compliance and engineering documents

06 Manufacturing process

From production to testing

Production — Power Transformers
01Production
Assembly — Power Transformers
02Assembly
Testing — Power Transformers
03Testing

Downloads & support

Technical documents

HKXR POWER Technical Selection Guide

Guide for initial technical selection of distribution, power, dry-type, pole-mounted and pad-mounted transformers.

Unlock download

Complete your details to download the HKXR POWER Technical Selection Guide.

07 Decision support

Frequently asked questions

When should Power Transformers be selected instead of Oil-Immersed Transformers?

For Malawi, choose Power Transformers when the main duties are Transmission substations and Sub-transmission substations; compare Oil-Immersed Transformers when Utility distribution networks and Distribution substations better match the site. Final selection depends on the installation environment, network topology, fire or oil-containment requirements, rating and project specification.

How should the main configuration options for Power Transformers be selected?

Key choices include ONAN/ONAF cooling stages, tap changer / OLTC and monitoring and protection. Select them according to the load profile, connection arrangement, installation environment, protection philosophy and utility/EPC specification; items shown as options or project engineering are not automatic standard equipment.

What installation conditions should be confirmed for Power Transformers projects in Malawi?

Confirm ambient temperature, altitude, humidity, dust or corrosion exposure, indoor/outdoor location, ventilation, access and maintenance clearances. For applications such as Transmission substations, Sub-transmission substations and Power generation, cooling, enclosure or insulation and protection should be reviewed during engineering rather than assuming one environmental class for the whole country.

Which standards and utility/project requirements should be confirmed in Malawi?

Use MS-IEC 60076 + ESCOM/MBS project requirements as the starting technical reference. Requirements from ESCOM / project utility requirements should also be confirmed. Final losses, temperature rise, impedance, taps, accessories, tests and documentation must be checked against the applicable project specification; this page does not imply automatic approval by any authority.

What tests, drawings and documents should be agreed before the purchase order?

Confirm the applicable routine tests, general arrangement drawings, electrical datasheet, accessory list and inspection/test documents before manufacturing. Type or special tests, witnessing and additional reports should be specified when the project requires them. For Power Transformers, also confirm site-specific environmental and installation engineering.

What information does HKXR need to prepare a technical quotation?

Provide at least Rated capacity, Primary voltage, Secondary voltage, Phases, the selected ONAN/ONAF cooling stages / tap changer / OLTC options, installation conditions and the applicable project or utility specification. If available, attach the SLD, datasheet or tender specification so the configuration can be reviewed before quotation.

Let’s discuss your project

Request a quote

Review your configuration and continue via WhatsApp.

Alternative contact

WhatsApp

Selected configuration

Select the main project parameters.

Edit configuration

Attach the technical data sheet, single-line diagram, photos or project documents. Send the file manually via WhatsApp.